I don't remember reading that.
I've never seen that on any of my projects before.
90% sounds more like slurry than concrete.
If I can remember at work, I'll ask one of my engineers.
Are there any cracks?
I'm an electrical engineer, I have no idea what the actual water mix is. I'm sure it's exactly the same mix as every other foundation in New England. It's just that a foot-thick, 40' x 40' foundation is comprised of a lot of water, and it continues to express moisture for some time, 4 to 5 years (according to experts). The only crack in the foundation is a vertical one right at the corner of the notch for one of the carrying sticks, which was already there when we moved in. Here's an excerpt from an article I found.
How Long Does Concrete Take to Set?
In most cases, standard concrete (or full strength concrete) has a setting time of around one day, sometimes two days depending on the environment in which it is set. However, concrete reaches its full strength after approximately 25-28 days. You should be able to walk and perform normal tasks on concrete one week after its application. However, the concrete will only be at around 70-70% of its full strength, so driving heavy machinery on it is not advised during this time.
However, concrete will continue curing for years
While its optimum strength is known to peak roughly a month after its installation, concrete will continue to harden and develop as time goes on. However, while concrete does continue hardening, it doesn’t necessarily benefit its structure, as it essentially becomes unnecessary.
Why does this happen?
Cement and water are mixed together (along with aggregates) to form concrete and during this, the cement particles begin mixing with the water which forms bonds. In turn, this makes the mix stronger, hardening as long as moisture is present (although, it is far slower).
Other factors that affect concrete setting time
One of the most important factors to address in concrete hardening is the role moisture plays. Concrete needs the right amount of moisture in order to set at maximum strength. Too much water will see the concrete cure too fast, resulting in poor overall structural integrity and strength, too little and the concrete will be much harder to work into place.